Skip to content
PLATFORM

Serialization & Track-and-Trace

Give each product a unique code and follow it from the line to dispatch. TraceXL works with different production systems and includes warehouse and production planning tools.

AI-nativeLine-system agnosticWMS + Production Planning built inLive in 6–8 weeks
BEYOND THE BARCODE

Most manufacturers believe they're traceable. Most of them aren't.

WHAT YOU SEE

A barcode / label on every unit

  • It scans
  • It carries the ID, batch/lot and date codes
  • It looks done
  • “We print serialized labels; therefore we're covered.”
WHAT'S MISSING

The digital event behind it

  • The data your customer's system, auditor or regulator reads travels as a structured event file
  • Not a PDF. Not the label.
  • If it never fires, the shipment is flagged, held, or rejected.
!

A label without an event is compliance theatre.

WHY TRACEXL

Four reasons to choose TraceXL

Delivered and supported end-to-end by Proctel Consulting Services — built differently from legacy serialization suites.

Truly AI-native

Isolation-Forest + LSTM anomaly scoring flags counterfeit, diversion and quality outliers in real time — not a bolt-on report.

Line & vendor agnostic

Integrate with any major line-control / vision system across industries, or run fully standalone with manual operations where none exists.

Fully modular

WMS (FEFO/FIFO, quarantine, cold-chain) and Production Planning (demand → serial-seeded work order) ship in the box.

Fast & nimble

Live in 6–8 weeks with Proctel's agile delivery — not the 12–18 month, capital-scale implementations of legacy vendors.

ARCHITECTURE — SIMPLIFIED

Two integration boundaries. No custom code per customer.

L5

Customer & Enterprise

Trading partners · customer/ERP systems (SAP, TraceLink, etc.) · regulators

L4

TraceXL (Proctel-delivered)

Serial/ID generation · event repository · compliance · exchange · WMS · Production Planning

L3

Site

Line system (any vendor) — or TraceXL manual mode

L2 / L1

Line

Line controller · printers · vision · scanners

●

The two integration boundaries — L3↔L4 (IDs out, events in) and L4↔L5 (regulated/customer exchange) — are both config-driven connectors, never custom code per customer.

ONE PLATFORM. EVERY MANUFACTURING INDUSTRY.

TraceXL: the same engine traces any manufactured product

TraceXL is built on open GS1 identity and event standards (SGTIN, SSCC, EPCIS) — the same backbone that serializes regulated pharma also fits every other manufacturing vertical Proctel serves.

Pharmaceuticals & CDMOs

DSCSA, EU FMD, India CDSCO, GCC serialization & reporting.

Medical Devices

UDI serialization & full-lifecycle traceability.

Food & Beverage

Lot traceability, cold-chain and recall readiness.

Electronics & Industrial

Component genealogy, warranty & counterfeit control.

Cosmetics & FMCG

Anti-counterfeit and grey-market control.

Chemicals & Agrochemicals

Regulatory track-and-trace across the supply chain.

Nutraceuticals

Authentication & consumer-facing engagement, built on trust.

Luxury & Brand Goods

Provenance verification and diversion detection.

DEPLOYMENT — NEVER LIKE BEFORE

Live in 6–8 weeks. Not 6–12 months.

Proctel's agile delivery with pre-configured regulatory and industry profiles means clients start producing compliant, traceable output in weeks, measured against the 6–12 month timelines of legacy enterprise suites.

Week 1–2

Discovery & setup workshop

Master data, ID/labeling profiles, trading-partner or customer identifiers, connector config.

Week 3–4

Integration & operations

Line agent or manual mode; printer, scanner & event connectivity.

Week 5–6

One line live

Highest-volume product live on one production line.

Week 7–8

Validate & scale

End-to-end test with your customer/partner; roll out to more lines.

Discuss tracexl with Proctel

Tell us what you are trying to transform. We can start with a focused conversation around your goals, constraints and priorities.